Can I add time for two projects during the same timespan?

Add Time for Two Projects at the Same Time

Question:

Is it possible to add time for two projects during the same timespan?

Answer:

No, Hubstaff will only allow you to work on one project during the same 10 minute interval. If you add manual time at the same block of time you have tracked automatically, the manual time will overwrite the automatic time.

  • Was this Helpful ?
  • Yes   No
  • Was this Helpful ?
  • Yes   No